Village placement begins! 4-21-08-> |
 |
 |
<-Mural painted 4-19-08 |
|
Drop ceiling track being installed 4-10-08-> |
 |
 |
<--sidewalks and porch poured 4-2-08 |
|
a/c units installed 4-1-08--> |
 |
 |
<-- sheetrock on the walls 3-25-08 |
Our fearless volunteer work crew helping
to complete the interior --> |
 |
|
Interior walls coming up 3-12-08 --> |
 |
 |
<-brick work and sign completed 2-27-08 |
|
Brick work begins 2-25-08 --> |
 |
 |
<-- Roof is on! |
|
metal siding coming along 1-31-08 --> |
 |
 |
<--up with the steel structure 1-19-08 |
|
the slab is poured and stained--> |
 |